The Foundry, Fish Island

Picture1

AREA

  • Fish Island, Hackney Wick, London E3 2PS
  • Built on a network of canals, Hackney Wick and Fish Island have a rich industrial and residential heritage
  • Minutes from The Queen Elizabeth Olympic Park
  • Minutes away from Westfield Stratford City – One of the largest urban shopping centres in Europe, with a wide selection of local shops, bars, theatres and restaurants
  • Convenient public transport with easy access to central London from both Hackney Wick and Stratford Stations
  • The area is currently going through a major regeneration partially credited to its proximity to the Olympic Park

Picture2

THE DEVELOPMENT

  • A range of 1-3 bedroom apartments
    • 39 x 1 Bedroom apartments (541 sq ft to 667 sq ft)
    • 40 x 2 Bedroom apartments (751 sq ft to 890 sq ft)
    • 13 x 3 Bedroom apartments/ duplex  (1030 sq ft to 1372 sq ft)
  • Private balconies or terrace to each plot
  • Cycle storage

FINISHINGS

  • Modern and luxury fixtures and fittings including designer kitchens with quartz stone worktops along with
    high specification bathrooms with porcelain tiling
  • Forest oak doors with polished chrome ironmongery, matching wrapped door-lining, architraves and skirtings
  • Choice of white oak or ebony oak strip wood flooring to entrance hall, living area, dining area, kitchen and cloakrooms
  • Fascino digitally controlled Smart Tap & Smart Mirror with LED lighting,shaver socket, digital clock and de-mist pad in all bathrooms and ensuites
  • Fully applianced kitchens included. Zanussi stainless steel electric fan oven, Zanussi ceramic hob and Electrolux stainless steel chimney hood, Zanussi integrated fridge/freezer, washer/dryer and dishwasher
  • Audio visual entry system

FACILITIES

  • Communal roof terraces

THE DEVELOPER

Weston Homes Plc

ANTICIPATED COMPLETION

From Q2 2018

OTHER
– Tenure: 999 year lease
– Building Insurance: 10 year Premier Guarantee

PAYMENT TERMS

1. £2,000 payable upon reservation
2. 10% of purchase price less reservation payable within 28 days on exchange of contracts.
3. A further 5% of purchase price payable 6 months after exchange of contracts.
4. Balance of 85% payable upon completion

DEVELOPMENT BROCHURE

Brochure