The Foundry, Fish Island
AREA
- Fish Island, Hackney Wick, London E3 2PS
- Built on a network of canals, Hackney Wick and Fish Island have a rich industrial and residential heritage
- Minutes from The Queen Elizabeth Olympic Park
- Minutes away from Westfield Stratford City – One of the largest urban shopping centres in Europe, with a wide selection of local shops, bars, theatres and restaurants
- Convenient public transport with easy access to central London from both Hackney Wick and Stratford Stations
- The area is currently going through a major regeneration partially credited to its proximity to the Olympic Park
THE DEVELOPMENT
- A range of 1-3 bedroom apartments
- 39 x 1 Bedroom apartments (541 sq ft to 667 sq ft)
- 40 x 2 Bedroom apartments (751 sq ft to 890 sq ft)
- 13 x 3 Bedroom apartments/ duplex (1030 sq ft to 1372 sq ft)
- Private balconies or terrace to each plot
- Cycle storage
FINISHINGS
- Modern and luxury fixtures and fittings including designer kitchens with quartz stone worktops along with
high specification bathrooms with porcelain tiling - Forest oak doors with polished chrome ironmongery, matching wrapped door-lining, architraves and skirtings
- Choice of white oak or ebony oak strip wood flooring to entrance hall, living area, dining area, kitchen and cloakrooms
- Fascino digitally controlled Smart Tap & Smart Mirror with LED lighting,shaver socket, digital clock and de-mist pad in all bathrooms and ensuites
- Fully applianced kitchens included. Zanussi stainless steel electric fan oven, Zanussi ceramic hob and Electrolux stainless steel chimney hood, Zanussi integrated fridge/freezer, washer/dryer and dishwasher
- Audio visual entry system
FACILITIES
- Communal roof terraces
THE DEVELOPER
Weston Homes Plc
ANTICIPATED COMPLETION
From Q2 2018
OTHER
– Tenure: 999 year lease
– Building Insurance: 10 year Premier Guarantee
PAYMENT TERMS
1. £2,000 payable upon reservation
2. 10% of purchase price less reservation payable within 28 days on exchange of contracts.
3. A further 5% of purchase price payable 6 months after exchange of contracts.
4. Balance of 85% payable upon completion
DEVELOPMENT BROCHURE